Static analysis and architectural design must be integrated with each other in tensile structures. In order to prevent bagging that may occur due to the accumulation of snow and rain water on our structure, the system is subjected to pre-tensioning by pulling the membrane fabric and cable networks. A 3-dimensional configuration is created between membrane and cable networks. As a result, both the formation of a flat surface and the removal of water by preventing bagging is ensured. The system is made ready for static analysis by providing the balance form as a result of the prestressing.